A commercial client contacted us with an urgent request: a 3-phase outlet was required within 48 hours to keep a construction project on schedule. The existing single-phase supply at the site was insufficient for the equipment being brought in, and a delay would have resulted in significant programme overrun.
Three-phase installations require careful coordination — the supply authority needed to be notified, the existing switchboard assessed for capacity, and the installation completed and certified before the equipment could be energised. All of this had to happen within a tight window.
We attended site within two hours of the initial call for an assessment. The existing board had sufficient capacity to support a new 3-phase circuit without a full upgrade. We coordinated with the network distributor for the necessary approvals, ran the new 3-phase circuit to the required location, installed a 32A 3-phase outlet in a weatherproof enclosure, and completed all testing and certification.
The installation was energised within 36 hours of the initial call — ahead of the 48-hour deadline.
The project stayed on schedule. The client had a reliable, compliant 3-phase supply for the duration of the works, and the outlet remained in place for ongoing site use.
“Even when we urgently needed a 3-phase outlet installed within 48 hours, he delivered and kept our project on track.” — Harry C., Diamond Creek

Tell us what you need — phone enquiries get a call back within 1 hour (Mon–Fri, 7am–6pm), email enquiries a reply within 24 hours. No obligation.